Why a feasibility study first
A large-scale solar project commits hundreds of millions of dollars. A solid feasibility study qualifies the resource, correctly sizes the system, secures financing, and defines the grid connection strategy.
Measurements and modelling
On-site weather stations for 6-12 months, correlated with satellite data. PVsyst hour-by-hour production modelling, P50/P90 estimates for financing.
Economic analysis
Detailed CAPEX, 25-year OPEX, financial modelling (IRR, NPV, DSCR, LCOE). Calculated LCOE for Kibomango: below USD 0.06/kWh.
Final deliverable
A 180-page report designed to serve directly as an EPC tender basis and financing dossier.