Technical, environmental and financial feasibility study for a 1,000 MW photovoltaic solar plant at the Kibomango site in Kinshasa.
iKas Global conducted feasibility studies for a 1,000 MW solar plant at Kibomango (Kinshasa), a strategic project for the DRC energy transition.
- Site and solar resource assessments: irradiation, land suitability, environmental conditions.
- Technical studies and plant design: configuration, technology selection, energy production modelling.
- Environmental and social impact assessments.
- Grid integration and transmission infrastructure analysis.